Structure(1) The frame is split steel welding, parts assembly structure;(2) Rack, on skateboards and welding around wall panels shall be subject to full stress annealing treatment after the eliminationof internal stress, and then processing the parts with a whole face, to ensure that the static accuracy of machine tools;(3) Paint the pieces before welding subject to the surface of sand blasting, surface clean-up level for SA2.5 (GB8923-88), afterthe paint coating machine delivery, installation and commissioning at the scene after the paint surface. Nippon polyurethanetopcoat paint used, the color specified by the demand side;